Production time — exactly how long your decorated order takes
The total time until you have the shirts in hand breaks down into three independent blocks: fabric sourcing, decoration production and shipping. This page lists the base production time per technique and quantity – the configurator shows the binding total for your exact order.
1. The delivery-time formula
+ Decoration production (technique × quantity × positions)
+ Shipping (DE 2 WD, EU 3–5 WD, world 7–10 WD)
The three blocks run serially, not in parallel – we must have the blank textiles here before decoration can start, and the parcel can only leave the house once the finishing is done. The longest variant lead time determines when all pieces are complete and we can begin.
2. Decoration production time per technique
All values in working days (WD). Set-up day applies on first motif, is skipped on repeat orders. Each additional print position on the same garment adds +1 WD.
| Technique | 10–99 | 100–499 | 500–999 | 1.000–1.999 | 2.000–3.499 | 3.500+ | Setup + | Express |
|---|---|---|---|---|---|---|---|---|
| DTF digital print | 6 WD | 6 WD | 8 WD | 8 WD | 10 WD | 10 WD | +2 WD* | × 0,6 |
| Embroidery | 10 WD | 10 WD | 12 WD | 14 WD | 14 WD | 16 WD | +4 WD | × 0,6 |
| Flex-Transfer | 6 WD | 6 WD | 8 WD | 8 WD | 10 WD | 10 WD | +2 WD | × 0,6 |
| Flock-Transfer | 6 WD | 6 WD | 8 WD | 8 WD | 10 WD | 10 WD | +2 WD | × 0,6 |
* DTF: set-up day applies only to the first DTF motif of the order – every additional DTF motif is produced on the same transfer sheet without extra set-up time (and without extra set-up fee).
Additional time surcharges
- Puff embroidery (3D): +1 WD – raised stitching runs slower than flat embroidery.
- Complex vectorisation: +1 WD on top of set-up (photorealistic artwork / >50 paths); skipped on repeat orders.
- Reflex / glitter film / metallic yarn: 0 WD – no time impact; costs are listed on the pricing page.
How Express works exactly
Express halves only the base production time (rounded up), not the set-up day, the position surcharge or special-effect days. Example: embroidery 100 pcs first motif = 10 WD base + 4 WD set-up = 14 WD normal; with Express = ceil(10 × 0,6) + 4 = 10 WD. The decoration total is billed +30 %.
3. Fabric sourcing – the variant with the longest lead wins
Each colour-size combination of a product has its own stock status and supplier lead time. When you order different variants (e.g. 10 red S + 10 red XL + 10 black XL), production starts only once all variants have arrived in our warehouse. The variant with the longest lead time therefore determines the whole decoration start.
- Direct ex stock: 0 working days – production starts immediately.
- Supplier warehouse A: 2–4 working days.
- Supplier warehouse B: 5–10 working days.
- Factory re-order: 2–6 weeks (for very specific colours or sizes).
The product configurator shows the variant lead time per selected colour-size. You can switch to an in-stock colour to shorten the overall timeline.
4. Worked examples
Example 1 — 50 DTF-printed T-shirts, all ex stock
Fabric sourcing: 0 WD (ex stock) · DTF production 50 pcs: 6 WD + first motif 2 WD = 8 WD · shipping DE: 2 WD
= 10 working days until delivery
Example 2 — 100 embroidered hoodies, one variant with 5 WD lead
Fabric sourcing: 5 WD (longest variant) · Embroidery 100 pcs: 10 WD + punching 4 WD = 14 WD · shipping DE: 2 WD
= 21 working days until delivery
Example 3 — same order with Express (base time −50%)
Fabric sourcing: 5 WD · Embroidery Express: base ceil(10 × 0,6) = 6 WD + set-up 4 WD = 10 WD · shipping DE: 2 WD
= 17 working days until delivery (+30 % on decoration total; Express halves only the base time, not set-up / positions)
5. Timeline shown in the configurator
When you configure your decoration on a product page, the configurator shows the binding delivery timeline as three stacked blocks: fabric sourcing (max variant lead), decoration production, shipping. Each change (switching to in-stock colours, enabling Express, adding/removing positions) updates the total in real time.
How your decorated order moves from draft to delivery
Six transparent steps with written status under Account → Finishing offers. Nothing is produced before you release the print preview — the configurator shows the binding delivery date.
- 1ConfigurationOnline configurator or request via service@clubmartin.de.
- 2Inspection reportTextile-finishing specialist checks file & placement.
- 3Print previewPhotorealistic mock-up on the chosen product plus binding quote.
- 4Your releaseRelease by click in your account — or request changes.
- 5Order & productionOffer goes to cart, production starts after order.
- 6QC & deliveryEvery piece checked against the released preview, DHL / DPD with tracking.
Need the pricing breakdown too?
Full price tables, setup fees, material surcharges and worked examples – everything on one page.